Trial run on down line to commence soon
Agra: The Uttar Pradesh Metro Rail Corporation (UPMRC) continues to maintain remarkable momentum in the execution of the Agra Metro project.
Track work for downline of the underground stretch between Mankameshwar Metro Station and RBS College Metro Station is progressing at a rapid pace, marking another significant milestone in the development of the Agra Metro Project.
Following the successful train trial run on the up line, the installation of ballast less track in the downline tunnel has been expedited with precision and advanced construction techniques.
Specialized machinery and experienced technical teams are being deployed to ensure high standards of safety, accuracy, and quality during the track laying process.
The ballastless track system being implemented in the underground section is designed to provide enhanced safety and operational stability, reduced maintenance requirements, smoother movement, and long-term durability and reliability
The downline track installation includes systematic activities such as base preparation, track slab casting, rail fastening, alignment, and precision welding.
Each stage is being closely monitored by experts to ensure adherence to international standards of metro rail construction.
UPMRC remains fully committed to delivering a world-class metro rail system to the people of Agra.

